Aqua City Works Status - November 2020

We are in the first part of November 2020 and the construction of the first block of the Aqua City residential project has reached the structure of the tenth floor out of the 11 provided.

Since the last status was published last month, the building has been built with 2 floors. We are working hard on the structural part of the 11th floor (the walls are raised, the screed is to be poured) and we have finished the last parts of the masonry (interior partitioning) of the eighth floor.

The interior installation works - thermal, sanitary, electrical - are in full assembly process. Our team of installers - all trained and authorized by REHAU perform the last works on the 6th floor.

The pouring of the screed for the protection of the thermal and electrical installations for the next 3 floors (floors 3-4-5), and of the final screed for the first and second floor were continued.

On the first 3 floors, from each of the 3 stairs of the block, the plastering was finished.

All these processes go in parallel, until the end of November 2020, when we estimate that the structure of the 11 floors will be completed.

Apartments with SMART compartmentation

Apartments with SMART compartmentation

The area of an apartment is important, but more important than the number of useful square meters is the way the latter are thought and divided.

Here at Aqua City we build and finish apartments with a SMART compartment . Thus, the 32 usable square meters of an Aqua City studio apartment or the 52.75 usable sqm of a 2-room apartment type offer the comfort associated with a much larger space.

The concept of "SMART compartmentalization" is necessary and desirable for the new space - which will become your apartment - to convince you that it can satisfy all your needs for design, comfort, freedom and storage .

Another plus of Aqua City apartments - regardless of the number of rooms - is the transformation of the masonry wall between the kitchen and living room into a glass one. The advantages of this concept? More light, a little elegance, an invitation to communication. The two rooms form a whole, while maintaining their own personality.

What effect does this glass wall create between the kitchen and the living room? We recreated it on a 1: 1 scale in our showroom in Rocilor Street. Here you can see what the kitchen looks like in a studio, the kitchen of a 2-room apartment, the kitchen of a 3-room apartment.

In the 11 months of construction of Block 1, the following were used:

In the 11 months of construction of Block 1, the following were used:

  • 1,400 tons of iron
  • 12,750 cubic meters of concrete.
  • 100,000 YTONG bricks

According to our estimates, block no. 1 in the Aqua City residential neighborhood will be ready "turnkey" in the middle of 2021 . There will be a period in which we will deal with the legal part - dismantling and other technical documents - and we will welcome the first tenants in December 2021 .

But, at this moment, in our showroom from 12-16 Rocilor Street, we have built on a 1: 1 scale three apartments that respect all the technical details of the future Aqua City apartments. So, by scheduling a viewing - virtual or aievea - you can see how the space for a studio apartment, for a two-room apartment and for a three-room apartment was designed and divided. All three spaces are fully equipped and furnished to make you feel what your life will be like in Aqua City.